RBS Scaffolding were called upon for our special resources and expertise to design and implement this bespoke access solution for BAE Systems on one of the most exposed sites on the south coast.
The base support structures and access staircase were constructed using our Cuplock System. The spine beams were formed with 10 lines of 750mm aluminium beams. The main access scaffold was erected from traditional tube & fittings allowing full access to this uniquely shaped equipment. Finally a Hakitec 750 Duo-Pitched Roof was added to the access structure together with shrink wrapping to provide complete protection to the radar during the refurbishment.