The building wrap was made up of two elevations covering a very complex scaffolding structure. The print is of Loseley House as it was to undergo extensive and necessary renovation and would have been almost unseen under all the scaffolding.
There are many challenges in making sure the print fits the scaffolding, as the structure is much larger than the building. There was also the added challenge that the front door was still to be used so the print had to line up with the actual door.
The installation was carried out by RBS Scaffolding and took a total of 15 men to lift the building wrap into place.
The building wrap was produced by projectprintmanagement.co.uk – many thanks to them for the use of their videos and images.