The circular storage tank was completely clad with scaffolding to allow full access for refurbishment and repainting works.
Built in a series of 3.60m towers the completed structure required 8,000 scaffold fittings and 34,000ft of scaffold tube. RBS Scaffolding currently supply access scaffolding to all areas of the fuel depot for maintenance and repairs from the storage tanks pictured above all the way out to the end of the jetty pictured below.